CHN
EMAIL
LOGIN
投資者
投資者2
投資者1
HOME
About Us
Services
Achievements
Innovation
Credit Honor
Culture
Achievements
Achievements
Rail(Beijing)
Rail(Outside of Beijing)
Civil Construction
Municipal Engineering
International Engineering
Others
Home
Achievements
Rail(Outside of Beijing)
BACK
Rail(Outside of Beijing)
軌道交通(外埠)
Guangzhou subway
2016-12-28
Guangzhou subway - engineering survey, third - party monitoring, geotechnical investigationSince its establishment in Guangzhou in 1994, CKI has been involved in the construction of Guangzhou Metro Li
更多詳細
Geotechnical Investigation of Shanghai Metro Line 13 and Line 7
2016-12-28
Geotechnical Investigation of Shanghai Metro Line 13 and Line 7: Zhaojiabang Station and Nampo Station13 line length of 33.6km, with 5km of the Expo River section. Line 7 Nanpu Station is the largest
更多詳細
Tianjin Metro Line 2,5,6
2016-12-29
Tianjin Metro Line 2,5,6 - geotechnical engineering survey, engineering survey, monitoring, testingThe total length of the No.2, No.5 and No.6 lines are 22.79km, 33.6km and 56.13km respectively. In th
更多詳細
Nanjing Metro Line 3 and 4, Ningtian Intercity Phase I
2016-12-30
Nanjing Metro Line 3 and 4, Ningtian Intercity Phase I - Third Party Monitoring, Geotechnical Investigation, Engineering SurveyLine 4 and Line 4 and Ningtian Intercity Line 1 are 44.83km, 43.1km and 4
更多詳細
Line 1 of Ningbo Rail Transit
2016-12-30
Line 1 of Ningbo Rail Transit - Survey Supervision, Engineering Survey, Third Party MonitoringNingbo City, the first subway line, a total length of 21km, two full-length 23.3km.
更多詳細
Nanning City Rail Transit Line 1 and 2
2016-12-30
Nanning City Rail Transit Line 1 and 2 - Geotechnical engineering survey, engineering survey, third-party monitoring, foundation pit precipitation test, construction drawing reviewNanning Metro Line 1
更多詳細
1
2
3
4
Skip to:
GO