CHN
EMAIL
LOGIN
投資者
投資者2
投資者1
HOME
About Us
Services
Achievements
Innovation
Credit Honor
Culture
Achievements
Achievements
Rail(Beijing)
Rail(Outside of Beijing)
Civil Construction
Municipal Engineering
International Engineering
Others
Home
Achievements
Municipal Engineering
BACK
Municipal Engineering
市政工程
Tianjin Railway Station Project
2016-12-28
Tianjin Railway Station Project - geotechnical investigation, hydrogeological investigation, engineering survey, monitoring and detection, precipitation designCovers an area of 964,600 square meters,
更多詳細
Beijing Sixth Ring Road
2016-12-28
Beijing Sixth Ring Road - geotechnical engineering survey, engineering surveyLine length of 188km, accounting for more than 20% of Beijing Expressway, Beijing is the longest mileage, connecting the Me
更多詳細
Beijing City, northeast corner of the city line of contact
2016-12-30
Beijing City, northeast corner of the city line of contact - Geotechnical Investigation & SurveyingThe project is to alleviate the city of Beijing's traffic congestion to take the road network transfo
更多詳細
Shenzhen Metro New Shenzhen Station Project
2016-12-30
Shenzhen Metro New Shenzhen Station Project- Geotechnical investigation, topographic survey, underground pipeline survey, geological hazard assessmentIs the 2011 World Universiade, an important suppor
更多詳細
Tianjin-Qinhuangdao off-shore passenger transport hub supporting underground spa
2016-12-30
Tianjin-Qinhuangdao passenger dedicated Binhai station transport hub supporting underground space project (the first phase started) - third-party monitoringThe project includes underground parking gar
更多詳細
Beijing Fangshan South Road
2016-12-30
Beijing Fangshan South Road- geological hazard assessment, geotechnical investigation, engineering surveyThe project is about 12 kilometers long. The landforms are complicated, the natural environment
更多詳細
1
2
Skip to:
GO