CHN
EMAIL
LOGIN
投資者
投資者2
投資者1
HOME
About Us
Services
Achievements
Innovation
Credit Honor
Culture
Achievements
Achievements
Rail(Beijing)
Rail(Outside of Beijing)
Civil Construction
Municipal Engineering
International Engineering
Others
Home
Achievements
Rail(Beijing)
BACK
Rail(Beijing)
軌道交通(北京)
Beijing Metro Line 1
2016-12-28
Beijing Metro Line 1 - Geotechnical engineering investigation, engineering survey, safety risk assessment. New China 's first subway line, length 31.04km. New China's first subway project, sinc
更多詳細
Beijing Metro Line 2
2016-12-28
Beijing Metro Line 2 - Geotechnical Engineering Survey, Engineering SurveyThe total length of 23.1 kilometers, Beijing's first metro around the city.
更多詳細
Beijing Urban Railway Line 13
2016-12-28
Beijing Urban Railway Line 13 - Geotechnical Investigation, Engineering Survey, Safety Risk AssessmentAll 43km long, is the first all-ground line in Beijing.Beijing Urban Railway Line 13 is the first
更多詳細
Beijing Subway Line 5
2016-12-28
Beijing Subway Line 5 - the first subway project using shield tunneling technology, in the absence of any experience based on the case, in the Lama Temple test section of the construction to achieve t
更多詳細
Beijing subway, complex eight line
2016-12-28
Beijing metro eight line - geotechnical engineering survey, engineering surveyFor the Beijing subway line east extension project, was founded in 1989, nine underground stations, two on the ground, a t
更多詳細
Beijing Metro Batong Line
2016-12-28
Beijing Metro Batong Line - Geotechnical Engineering Survey, Engineering SurveyTotal length of 18.96 kilometers, overhead line 11.05 kilometers, ground line 7.91 kilometers a total of 13 stations, a d
更多詳細
1
2
3
4
Skip to:
GO